VDOT Traffic Alerts for Page County and Surrounding, March 24 – 28, 2025

Highway Work Zones in the VDOT Staunton District

Ditch Drainage Work – Augusta County (VDOT Staunton District)

Announcement / media release via VDOT, Staunton District.

The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks.

The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.

Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.


PAGE COUNTY

PRIMARY ROADS

Route 211 Business (West Main Street, Luray) – Shoulder closures between Route 616 (Leaksville Road) and Memorial Drive for utility work, 9 a.m. to 2:30 p.m. through April 1.

Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. weekdays.

SECONDARY ROADS

Various roads – Flagger traffic control for brush cutting and pipe cleaning, 7:30 a.m. to 3 p.m. on weekdays.


ROCKINGHAM COUNTY

INTERSTATE 81

*NEW* Mile marker 237 to 243, northbound and southbound – Right shoulder closures including along Exit 240 off-ramps for sign work, 8 a.m. to 5 p.m. Monday through Friday.

*UPDATE* Mile marker 238 to 237, northbound and southbound – Overnight right lane closures for shoulder strengthening through June 2025, beginning on southbound I-81. Work will generally take place Monday through Friday nights from 8 p.m. to 7 a.m. Work-zone speed limit 60 miles per hour. Traffic restrictions are for construction of I-81 truck-climbing lanes.

Exit 240, northbound and southbound – Shoulder closures along ramps to and from Route 257 for construction of additional turn lanes, 7:30 a.m. to 4:30 p.m. through July 1.

Mile marker 242 to 248, northbound and southbound – Overnight ramp closures and alternating lane closures as needed, 8 p.m. to 7 a.m. Expect delays. 24/7 shoulder closures. Traffic restrictions are related to Route 33 bridge and interchange project with completion expected in September 2026.

*NEW* Mile marker 253 to 254, northbound and southbound – Overnight right lane and shoulder closures for Route 721 overpass bridge inspection, 8 p.m. to 6 a.m. Friday night.

*NEW* Mile marker 259 to 260, northbound and southbound – Overnight right lane and shoulder closures for Route 798 overpass bridge inspection, 8 p.m. to 6 a.m. Friday night.

PRIMARY ROADS

*NEW* Route 11 (North Valley Pike) – Northbound right shoulder closures near Route 721 (Fellowship Road) intersection for sign work, 8 a.m. to 5 p.m. Monday through Friday.

*NEW* Route 33 (Spotswood Trail) – Westbound alternating lane closures near Route 340 interchange for maintenance to bridge over Route 340, 7 a.m. to 6 p.m. through April 4.

*NEW* Route 33 (Rawley Pike) – Mobile traffic control between Route 612 (Peake Mountain Road) and Route 734 (Bank Church Road) for pavement marking, 10 a.m. to 3 p.m. through April 11.

Route 33 (Rawley Pike) – Flagger traffic control between Laurel Woods Lane and Switzer Lake Road/Skidmore Fork for paving, line-painting and guardrail work related to road widening and curve improvements, 7 a.m. to 6 p.m. through May 2025.

Route 33 (East Market Street, Harrisonburg) – Single-lane traffic between Vine Street/Hawkins Street and Evelyn Byrd Avenue during daytime or overnight hours due to bridge construction. Occasional full closures as needed. Shoulder closures 24/7. Traffic restrictions are for Route 33 bridge replacements and interchange improvement with expected completion in September 2026.

*NEW* Route 42 (John Wayland Highway) – Overnight left lane closures northbound and southbound between Harrisonburg city limits and Bridgewater town limits for bridge inspection, 9:30 p.m. to 5:30 a.m. Monday through Thursday nights.

*NEW* Route 253 (Port Republic Road) – Mobile traffic control between Route 1163 (Rosedale Drive) and Route 331 (Alumnae Drive) for pavement marking, 10 a.m. to 3 p.m. through April 11.

Route 253 (Port Republic Road) – Temporary traffic signal between Route 1601 (New Haven Road) and Route 1605 (Water Street) for maintenance to North River bridge, 24/7 through June 30. Vehicle width restriction 11 feet.

*NEW* Route 257 (Ottobine Road) – Mobile traffic control between Route 775 (Judge Paul Road) and Route 42 Business (Main Street, Dayton) for pavement marking, 10 a.m. to 3 p.m. through April 11.

Various roads – Mobile traffic control for mowing operations. Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs, pavement patching and brush cutting, 7:30 a.m. to 3 p.m. weekdays.

SECONDARY ROADS

Route 682 (Friedens Church Road) – Eastbound and westbound single lane closures between I-81 interchange and Route 867 (North River Road) for road widening project, 7:30 a.m. to 4:30 p.m. through July 1.

Route 800 (McCauley Drive, Timberville) –Flagger traffic control between Route 42 (South Main Street/Timber Way) and Fourth Avenue for sidewalk construction, 9 a.m. to 3:30 p.m. through May 1.


WARREN COUNTY

INTERSTATE 66

*UPDATE* Mile marker 1 to 0, westbound – Shoulder closures for sign installations, 6 a.m. to 3:30 p.m. through April 18.

*NEW* Mile marker 5 to 6, eastbound and westbound – Overnight alternating lane closures for inspection Route 609 overpass bridge, 8 p.m. to 6 a.m. Wednesday night.

*NEW* Mile marker 9 to 8, westbound – Right shoulder closures for sign work, 8 a.m. to 5 p.m. Monday through Friday.

INTERSTATE 81

*UPDATE* Mile marker 300 to 299, northbound and southbound – Overnight alternating lane closures for pavement and guardrail work, 8 p.m. to 7 a.m. through night of April 24. Daytime shoulder closures for sign installations, 7 a.m. to 3:30 p.m. through April 18. Traffic restrictions are related to I-81 widening project.

PRIMARY ROADS

*NEW* Route 55 (John Marshall Highway) – Overnight flagger traffic control at intersections with Route 647 (Dismal Hollow Road) and Route 79 (Apple Mountain Road) for signal inspections, 8 p.m. to 6 a.m. Wednesday night.

*NEW* Route 340 (Stonewall Jackson Highway) – Overnight flagger traffic control at intersections with Route 649 (Browntown Road) and Route 619 (Rivermont Drive) for signal inspections 8 p.m. to 6 a.m. Wednesday night.

*NEW* Route 340 (Winchester Road) – Overnight single lane closures between Route 627 (Reliance Road) Route 661 (Fairground Road) for signal inspections, 8 p.m. to 6 a.m. Thursday night.

*NEW* Route 522 (Winchester Road) – Overnight flagger traffic control near the I-66 intersection for inspection of I-66 overpass bridges, 8 p.m. to 6 a.m. Tuesday night.

SECONDARY ROADS

Route 658 (Rockland Road) – Closed to through traffic between Route 340/522 (Winchester Road) and Route 705 (Fishnet Boulevard) for construction of bridge over Norfolk Southern Railway. Follow posted detour. Estimated completion December 2025.


Vegetation management may take place district-wide on various routes. VDOT reminds motorists to use extreme caution when traveling through work zones.

For updated traffic alerts and traveler information, dial 511 or visit

https://511.vdot.virginia.gov/

The VDOT Customer Service Center can assist with reporting road hazards, asking transportation questions, or getting information related to Virginia’s roads. Call 800-FOR-ROAD (800-367-7623) or use its mobile friendly website at

https://my.vdot.virginia.gov

Agents are available 24 hours-a-day, seven days a week.

COMPLETE MEDIA RELEASE (with all Staunton District Counties) HERE.


Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top